Under Mission Save Planet we started waste to energy miniature modules of small capacity. They convert all types of waste into Industrial Gases. It is designed for township with 1lakh population and above. All we need is installation space and permission. This project is executed on build operate and own basis. It generates ESG Bond called CiiL Grinmile and that is readable internationally. The service level contract is for 30 years
Thanks dhanyawad OM

Leave a comment